Permits
1
Max Depth
6,000 ft
First Permit
2011-01-04
Latest Activity
2011-01-04
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2011-02-23
Shut-In
—
Plugged
2011-07-07
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2011-02
Last Production
2012-04
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 1,633 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| PALO PINTO | 3,715 ft | -2,082 ft |
| CADDO | 4,996 ft | -3,363 ft |
| ELLENBURGER | 5,245 ft | -3,612 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 4,996–5,002 ft | Open hole |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 120 ft | 100 sx |
| 5.5" | 5,350 ft | 200 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet