Permits
1
Max Depth
10,000 ft
First Permit
1988-12-28
Latest Activity
1988-12-28
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 8,162–8,167 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 1,587 ft | 885 sx |
| 7" | 9,960 ft | 925 sx |
Permit History (1)
Applications (1)
#354626 A EP OPERATING COMPANY
received 1988-12-27
Records & Logs
1 completion filing on record.
W-2/G-1 1972-12-13
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in LAVACA County.
Well Details
- Well Number
- 1
- Max Depth
- 10,000 ft
- Drill Type
- Vertical
- County
- LAVACA
- District
- 2
- Operator
- EP OPERATING COMPANY
Operator
- Name
- EP OPER CO
- Location
- DALLAS
- P-5 Status
- Inactive (filed 1992-03-26)
- Total Permits
- 568