42-285-32278

Final Completion

ROUSE

LAVACA County · District 2 · SWIFT ENERGY COMPANY · VIENNA (FRIO 3000)

Permits

2

Max Depth

6,000 ft

First Permit

1994-12-23

Latest Activity

1994-12-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-05-02

Shut-In

Plugged

2004-10-21

!

EWA / Permit operator mismatch

Scheduling: SWIFT ENERGY COMPANY ≠ Permit: MOOSE OPERATING CO., INC.

Resolved via: schedulingSWIFT ENERGY COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-05

Last Production

2004-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,062–3,068 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"616 ft220 sx
4.5"3,610 ft910 sx

Permit History (2)

Applications (2)

#430817 A MOOSE OPERATING CO., INC.
received 1995-04-17
#430817 A MOOSE OPERATING CO., INC.
received 1994-12-09

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 1995-05-12 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in LAVACA County.

Well Details

Well Number
1
Max Depth
6,000 ft
Drill Type
Vertical
County
LAVACA
District
2
Completed
1995-05-02

Operator

Location
HOUSTON
P-5 Status
Inactive (filed 2005-09-22)
Cum Oil (all leases)
5,820,654 bbl
Cum Gas (all leases)
252,067,081 mcf
Total Permits
719