42-285-32680

Final Completion

WHEELER

LAVACA County · District 2 · TALON DEVELOPMENT CO. INC. · HOPE (MIOCENE 2640)

Permits

1

Max Depth

2,800 ft

First Permit

1999-02-03

Latest Activity

1999-02-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1999-03-02

Shut-In

Plugged

2000-08-16

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1999-03

Last Production

2000-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 230 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
FRIO 2,520 ft-2,290 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,520–2,522 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"315 ft220 sx
2.875"2,770 ft585 sx

Permit History (1)

Applications (1)

#482384 A TALON DEVELOPMENT CO., INC.
received 1999-02-01

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1999-04-20 log on file
W-2/G-1 1999-06-25

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in LAVACA County.

Well Details

Well Number
1
Max Depth
2,800 ft
Drill Type
Vertical
County
LAVACA
District
2
Completed
1999-03-02

Operator

Location
BOERNE
P-5 Status
Inactive (filed 2000-07-24)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
18,716,333 mcf
Total Permits
150