42-285-33510

Final Completion

BARNES

LAVACA County · District 2 · VIPER S.W.D. LLC · RUSSEK (7730)

Permits

3

Max Depth

16,000 ft

First Permit

2008-08-15

Latest Activity

2010-01-14

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2010-08-17

Shut-In

Plugged

2025-08-11

!

EWA / Permit operator mismatch

Scheduling: VIPER S.W.D. LLC ≠ Permit: SUNCOAST TECHNICAL SERVICES INC

Resolved via: schedulingVIPER S.W.D. LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-12

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3) Elevation 137 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
FRIO 2,900 ft-2,763 ft
YEGUA 4,960 ft-4,823 ft
LOWER YEGUA (Yegua)7,720 ft-7,583 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (6)

IntervalType
7,720–7,722 ftPerforated
7,766–7,770 ftPerforated
7,820–7,822 ftPerforated
13,549–13,553 ftPerforated
13,558–13,574 ftPerforated
13,595–13,614 ftPerforated

Casing (3)

SizeSet DepthCement
13.375"2,515 ft1,835 sx
9.625"10,537 ft1,965 sx
4.5"15,524 ft1,376 sx

Permit History (3)

Applications (3)

#689737 A SUNCOAST TECHNICAL SERVICES INC
received 2010-03-16
#689737 A SUNCOAST TECHNICAL SERVICES INC
received 2010-01-13
#667894 A KALER ENERGY CORP.
received 2008-07-30

Records & Logs

5 completion filings on record · 2 with log images at RRC.

W-2/G-1 2014-10-20 log on file
W-2/G-1 2011-04-02
W-2/G-1 2009-04-29
W-2/G-1 2009-03-24 log on file
W-2/G-1 2009-05-26

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in LAVACA County.

Well Details

Well Number
1
Max Depth
16,000 ft
Drill Type
Vertical
County
LAVACA
District
2
Completed
2010-08-17

Operator

Location
EL CAMPO
P-5 Status
Active (filed 2025-06-18)
Cum Oil (all leases)
286,997 bbl
Cum Gas (all leases)
1,339,171 mcf
Activities
G/PUR, OPRS/G, OPRS/O
Total Permits
43