42-287-31250
Final CompletionWERNECKE
LEE County · District 3 · SANTA FE MINERALS INC. · GIDDINGS (BUDA)
Permits
2
Max Depth
8,900 ft
First Permit
1982-05-25
Latest Activity
1984-06-29
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-06-21
Shut-In
—
Plugged
1991-01-19
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (6) Elevation 436 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| NAVARRO | 5,680 ft | -5,244 ft |
| PECAN GAP | 7,040 ft | -6,604 ft |
| AUSTIN CHALK | 7,430 ft | -6,994 ft |
| EAGLEFORD (Eagle Ford) | 8,158 ft | -7,722 ft |
| BUDA | 8,260 ft | -7,824 ft |
| GEORGETOWN | 8,385 ft | -7,949 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 8,020–8,159 ft | Perforated |
| 8,272–8,346 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 3,617 ft | 850 sx |
| 2.375" | 8,222 ft | — |
| 5.5" | 8,443 ft | 500 sx |
Permit History (2)
Applications (2)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 8,900 ft
- Drill Type
- Vertical
- County
- LEE
- District
- 3
- Operator
- SANTA FE MINERALS INC.
- Completed
- 1982-06-21
Operator
- Location
- DALLAS
- P-5 Status
- Inactive (filed 1993-05-20)
- Total Permits
- 133