42-287-31677
Final CompletionPEEBLES
LEE County · District 3 · ATLAS OPERATING LLC · HOOKER CREEK (NAVARRO A)
Permits
1
Max Depth
4,300 ft
First Permit
1984-07-23
Latest Activity
1984-07-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-08-16
Shut-In
—
Plugged
1985-12-19
EWA / Permit operator mismatch
Scheduling: ATLAS OPERATING LLC ≠ Permit: EAST TEXAS EXPLORATION
Resolved via: scheduling → ATLAS OPERATING LLC
Operator History
originally filed by EAST TEXAS EXPLORATION — asset transferred
Formation Tops (3) Elevation 360 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| TOP MIDWAY (Midway) | 3,550 ft | -3,190 ft |
| TOP NAVARRO A (Navarro) | 3,950 ft | -3,590 ft |
| TOP NAVARRO B (Navarro) | 4,080 ft | -3,720 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,963–4,013 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 160 ft | 115 sx |
| 4.5" | 4,260 ft | 670 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 4,300 ft
- Drill Type
- Vertical
- County
- LEE
- District
- 3
- Operator
- ATLAS OPERATING LLC
- Completed
- 1984-08-16
Operator
- Name
- ATLAS OPER LLC
- Location
- HOUSTON
- P-5 Status
- H (filed 2026-03-09)
- Cum Oil (all leases)
- 7,184,429 bbl
- Cum Gas (all leases)
- 10,995,911 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 78