42-293-30932

Final Completion

HANCOCK

LIMESTONE County · District 5 · CD CONSULTING & OPERATING CO. · HOSANNAH (WOODBINE)

Permits

1

Max Depth

2,900 ft

First Permit

1990-04-26

Latest Activity

1990-04-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-08-29

Shut-In

Plugged

2000-02-08

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
WOODBINE 2,708 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,708–2,716 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"101 ft50 sx
4.5"2,750 ft160 sx

Permit History (1)

Applications (1)

#372675 A CD CONSULTING & OPERATING CO.
received 1990-04-26

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1990-09-07 log on file
W-2/G-1 1991-01-18

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in LIMESTONE County.

Well Details

Well Number
1
Max Depth
2,900 ft
Drill Type
Vertical
County
LIMESTONE
District
5
Completed
1990-08-29

Operator

Location
BRIDGEPORT
P-5 Status
Inactive (filed 2025-07-22)
Cum Oil (all leases)
559,254 bbl
Cum Gas (all leases)
6,553,607 mcf
Total Permits
56