42-293-31172
SHUT INWHITE
LIMESTONE County · District 5 · HILLTEX OPERATING COMPANY LLC · BOX CHURCH (PETTIT)
Permits
4
Max Depth
9,450 ft
First Permit
1996-11-05
Latest Activity
2019-03-12
Lifespan
22 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2019-02-19
Shut-In
—
Plugged
—
P-5 Org Status: X
EWA / Permit operator mismatch
Scheduling: HILLTEX OPERATING COMPANY LLC ≠ Permit: DOWNS OPERATING COMPANY, LLC
Resolved via: production → HILLTEX OPERATING COMPANY, LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1997-03
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (10) Elevation 413 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BASE AUSTIN CHALK (Austin Chalk) | 3,310 ft | -2,897 ft |
| BASE MASSIVE ANHYDRITE (Massive Anhydrite (marker)) | 5,976 ft | -5,563 ft |
| RODESSA | 6,054 ft | -5,641 ft |
| RODESSA | 6,059 ft | -5,646 ft |
| PETTIT | 6,542 ft | -6,129 ft |
| PETTIT | 6,546 ft | -6,133 ft |
| TRAVIS PEAK | 6,721 ft | -6,308 ft |
| TRAVIS PEAK | 6,772 ft | -6,359 ft |
| COTTON VALLEY | 8,550 ft | -8,137 ft |
| COTTON VALLEY | 8,602 ft | -8,189 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Offset Well Tops (nearest 8 wells with tops)
What nearby completed wells reported.
Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).
Perforations (5)
| Interval | Type |
|---|---|
| 6,558–6,704 ft | Perforated |
| 6,803–6,813 ft | Perforated |
| 6,903–6,925 ft | Perforated |
| 7,752–7,762 ft | Perforated |
| 7,974–8,208 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 1,481 ft | 700 sx |
| 7" | 4,178 ft | — |
| 7" | 8,327 ft | 900 sx |
Permit History (4)
Applications (4)
Records & Logs
5 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
Well Details
- Well Number
- 5
- Max Depth
- 9,450 ft
- Drill Type
- Vertical
- County
- LIMESTONE
- District
- 5
- Operator
- HILLTEX OPERATING COMPANY LLC
- Completed
- 2019-02-19
Operator
- Name
- HILLTEX OPER CO, LLC
- Location
- FORT WORTH
- P-5 Status
- X (filed 2026-06-10)
- Cum Oil (all leases)
- 222,237 bbl
- Cum Gas (all leases)
- 216,883 mcf
- Activities
- OPRS/G
- Total Permits
- 125