42-295-30638

Final Completion

REYNOLDS C

LIPSCOMB County · District 10 · TXO PRODUCTION CORP. · LEAR (MORROW UPPER)

Permits

2

Max Depth

9,550 ft

First Permit

1979-02-13

Latest Activity

1983-09-14

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1987-10-28

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
7,477–7,500 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"2,446 ft1,400 sx
2.375"7,369 ft
4.5"9,223 ft1,180 sx

Permit History (2)

Applications (2)

#212521 A TXO PRODUCTION CORP.
received 1983-09-14
#42467 A TEXAS OIL & GAS CORP.
received 1979-02-13

Records & Logs

2 completion filings on record.

W-2/G-1 1983-10-19
W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in LIPSCOMB County.

Well Details

Well Number
1
Max Depth
9,550 ft
Drill Type
Vertical
County
LIPSCOMB
District
10

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1990-11-02)
Total Permits
3,227