Permits
1
Max Depth
5,104 ft
First Permit
1988-06-10
Latest Activity
1988-06-10
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
500 bbl/d
Max Pressure
1,000 psi
Injection Interval
4,318–4,330 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 315 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| HOCKLEY | 3,931 ft | -3,616 ft |
| YEGUA | 4,761 ft | -4,446 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 4,937–4,940 ft | Perforated |
| 5,686–5,689 ft | Perforated |
| ?–4,815 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 1,419 ft | 111 sx |
| 2.875" | 5,104 ft | 1,047 sx |
| 2.875" | 5,408 ft | — |
| 2.875" | 5,744 ft | — |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet