Permits
3
Max Depth
17,500 ft
First Permit
1997-07-16
Latest Activity
2002-04-18
Lifespan
5 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1997-11-09
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2002-03
Last Production
2009-01
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 335 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| RECKLAW | 9,058 ft | -8,723 ft |
| TOP OF WILCOX (Wilcox) | 9,160 ft | -8,825 ft |
| LULING | 9,996 ft | -9,661 ft |
| HOSTETTER | 10,740 ft | -10,405 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 10,785–10,794 ft | Perforated |
| 10,799–10,806 ft | Perforated |
| 10,818–10,826 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 2,042 ft | 1,465 sx |
| 9.625" | 8,800 ft | 980 sx |
Permit History (3)
Applications (3)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 17,500 ft
- Drill Type
- Vertical
- County
- LIVE OAK
- District
- 2
- Operator
- HANSON PRODUCTION COMPANY
Operator
- Name
- HANSON PROD CO
- Location
- CUERO
- P-5 Status
- Inactive (filed 2008-07-25)
- Cum Oil (all leases)
- 357,361 bbl
- Cum Gas (all leases)
- 50,400,412 mcf
- Total Permits
- 111