42-301-30470
Final CompletionJOHNSON W.D. JR. ET AL -X-
LOVING County · District 8 · HONDO OIL & GAS COMPANY DELAWARE · DIMMITT (CHERRY CANYON)
Permits
1
Max Depth
6,700 ft
First Permit
1983-08-30
Latest Activity
1983-08-30
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-10-11
Shut-In
—
Plugged
1990-06-07
EWA / Permit operator mismatch
Scheduling: HONDO OIL & GAS COMPANY DELAWARE ≠ Permit: ARCO OIL & GAS CO.
Resolved via: scheduling → HONDO OIL & GAS COMPANY DELAWARE
Operator History
originally filed by ARCO OIL & GAS CO. — asset transferred
Formation Tops (2) Elevation 2,937 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| DELAWARE LIME (Delaware) | 4,640 ft | -1,703 ft |
| CHERRY CANYON | 5,641 ft | -2,704 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 6,254–6,275 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 1,110 ft | 600 sx |
| 5.5" | 6,600 ft | 2,000 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 6,700 ft
- Drill Type
- Vertical
- County
- LOVING
- District
- 8
- Operator
- HONDO OIL & GAS COMPANY DELAWARE
- Completed
- 1983-10-11
Operator
- Location
- ROSWELL
- P-5 Status
- Inactive (filed 1992-02-27)
- Total Permits
- 69