42-303-30676

Final Completion

CABOT-WALTER

LUBBOCK County · District 8 · MERIT ENERGY COMPANY · LEE HARRISON

RRC Lookup

Permits

1

Max Depth

4,950 ft

First Permit

1981-03-05

Latest Activity

1981-03-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-06-06

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: MERIT ENERGY COMPANY ≠ Production: CROSS TIMBERS ENERGY, LLC (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: MERIT ENERGY COMPANY ≠ Permit: CABOT CORP.

Resolved via: productionCROSS TIMBERS ENERGY, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#110951 A CABOT CORP.
received 1981-03-05

Well Details

Well Number
4
Max Depth
4,950 ft
Drill Type
Vertical
County
LUBBOCK
District
8
Completed
1981-06-06

Operator

Location
DALLAS
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
61,295,428 bbl
Cum Gas (all leases)
662,992,144 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
1,048

External Links

Live © 2026 Petrora