42-307-30608

Final Completion

CHANDLER

MCCULLOCH County · District 7 · CHANCO INC. · HEART OF TEXAS (PENN.)

Permits

1

Max Depth

900 ft

First Permit

1981-10-15

Latest Activity

1981-10-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-11-11

Shut-In

Plugged

1985-06-04

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
260–263 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"575 ft125 sx

Permit History (1)

Applications (1)

#136664 A CHANCO INC.
received 1981-10-15

Records & Logs

1 completion filing on record.

W-2/G-1 1982-09-23

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in MCCULLOCH County.

Well Details

Well Number
3
Max Depth
900 ft
Drill Type
Vertical
County
MCCULLOCH
District
7
Operator
CHANCO INC.
Completed
1981-11-11

Operator

Location
OZONA
P-5 Status
Inactive (filed 1984-02-23)
Total Permits
7