42-313-30341

Final Completion

FANNIN M.G. UNIT #2

MADISON County · District 3 · FORCE 5 ENERGY LLC · DAY (WOODBINE)

RRC Lookup

Permits

1

Max Depth

10,500 ft

First Permit

1981-08-05

Latest Activity

1981-08-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-12-23

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: FORCE 5 ENERGY LLC ≠ Production: SOUTHWEST OPERATING, INC.-TYLER (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: FORCE 5 ENERGY LLC ≠ Permit: PARTEN, J. R.

Resolved via: productionSOUTHWEST OPERATING, INC.-TYLER

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#129069 A PARTEN, J. R.
received 1981-08-05

Well Details

Well Number
3
Max Depth
10,500 ft
Drill Type
Vertical
County
MADISON
District
3
Completed
1981-12-23

Operator

Location
HOUSTON
P-5 Status
Y (filed 2013-01-04)
Cum Oil (all leases)
144,283 bbl
Cum Gas (all leases)
178,929 mcf
Total Permits
10

External Links

Live © 2026 Petrora