42-317-43610
SHUT IN HorizontalSTRAIN 19 UNIT 1
MARTIN County · District 8 · XTO ENERGY INC. · SPRABERRY (TREND AREA)
Permits
1
Max Depth
10,200 ft
First Permit
2021-06-21
Latest Activity
2021-06-21
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2022-07-17
Shut-In
—
Plugged
—
P-5 Org Status: X
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2021-08
Last Production
2026-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (18) Elevation 2,710 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| SANTA ROSA | 1,101 ft | +1,609 ft |
| SANTA ROSA | 1,115 ft | +1,595 ft |
| YATES | 2,347 ft | +363 ft |
| YATES | 2,358 ft | +352 ft |
| QUEEN | 3,473 ft | -763 ft |
| QUEEN | 3,480 ft | -770 ft |
| GRAYBURG | 3,732 ft | -1,022 ft |
| GRAYBURG | 3,752 ft | -1,042 ft |
| SAN ANDRES - ACTIVE CO2 FLOOD; H (San Andres) | 3,776 ft | -1,066 ft |
| SAN ANDRES - ACTIVE CO2 FLOOD; H (San Andres) | 3,992 ft | -1,282 ft |
| SPRABERRY | 6,941 ft | -4,231 ft |
| SPRABERRY | 7,104 ft | -4,394 ft |
| DEAN | 8,435 ft | -5,725 ft |
| DEAN | 8,451 ft | -5,741 ft |
| WOLFCAMP | 8,626 ft | -5,916 ft |
| CISCO | — | — |
| PENNSYLVANIAN | — | — |
| WOLFCAMP | — | — |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Offset Well Tops (nearest 8 wells with tops)
What nearby completed wells reported.
Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).
Perforations (1)
| Interval | Type |
|---|---|
| 8,974–19,403 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 1,295 ft | 955 sx |
| 9.625" | 5,039 ft | 2,265 sx |
| 5.5" | 19,494 ft | 2,050 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
Well Details
- Well Number
- 1961DH
- Max Depth
- 10,200 ft
- Drill Type
- Horizontal
- County
- MARTIN
- District
- 8
- Operator
- XTO ENERGY INC.
- Completed
- 2022-07-17
Operator
- Name
- XTO ENGY INC
- Location
- SPRING
- P-5 Status
- X (filed 2026-04-08)
- Cum Oil (all leases)
- 772,419,164 bbl
- Cum Gas (all leases)
- 11,039,899,986 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 16,138