42-329-30927
Final CompletionFIRST UNITED METHODIST CHURCH-B-
MIDLAND County · District 8 · TEXACO E & P INC. · BRADFORD RANCH (STRAWN)
Permits
4
Max Depth
11,460 ft
First Permit
1980-08-18
Latest Activity
1996-04-01
Lifespan
16 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-08-02
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: TEXACO E & P INC. ≠ Production: CHEVRON U. S. A. INC. (reported 2018-01)
Resolved via: scheduling → TEXACO E & P INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
MIDLAND County disposal market →Permitted Volume
20,000 bbl/d
Max Pressure
2,265 psi
Injection Interval
4,531–5,523 ft
Injected (12mo)
1,491,514 bbl
Monthly injected volume (bbl, from H-10 filings through 2026-01-01)
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 2,739 ft (DF)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| SPRABERRY | 9,050 ft | -6,311 ft |
| STRAWN | 10,623 ft | -7,884 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (5)
| Interval | Type |
|---|---|
| 4,531–5,523 ft | Perforated |
| 7,951–8,080 ft | Perforated |
| 8,147–8,340 ft | Perforated |
| 10,632–10,736 ft | Perforated |
| 11,200–11,292 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 16" | 360 ft | 500 sx |
| 10.75" | 4,300 ft | 3,350 sx |
| 7.625" | 9,830 ft | 942 sx |
| 2.875" | 11,033 ft | — |
Permit History (4)
FIRST UNITED METHODIST CHURCH B · 11,395 ft
1996-04-01
Spud 1998-04-23
FIRST UNITED METHODIST CHURCH-B- · 11,395 ft
1996-04-01
FIRST UNITED METHODIST CHURCH-B- · 10,780 ft
1987-07-15
FIRST UNITED METHODIST CHURCH"B" · 11,460 ft
1980-08-18
Spud 1980-10-11
Applications (4)
Records & Logs
7 completion filings on record · 3 with log images at RRC.
+1 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 11,460 ft
- Drill Type
- Vertical
- County
- MIDLAND
- District
- 8
- Operator
- TEXACO E & P INC.
- Completed
- 1987-08-02
Operator
- Name
- TEXACO E & P INC
- Location
- HOUSTON
- P-5 Status
- Delinquent (filed 2003-01-22)
- Cum Oil (all leases)
- 176,155,764 bbl
- Cum Gas (all leases)
- 1,401,949,654 mcf
- Activities
- OPRS/O
- Total Permits
- 3,332