42-331-31109
Final CompletionHADRIAN-COFFIELD
MILAM County · District 1 · SANTEE CORPORATION · CHEROKEE (NAVARRO)
Permits
1
Max Depth
7,500 ft
First Permit
1981-07-02
Latest Activity
1981-07-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-08-20
Shut-In
—
Plugged
1985-10-12
EWA / Permit operator mismatch
Scheduling: SANTEE CORPORATION ≠ Permit: ENFIELD CORPORATION
Resolved via: scheduling → SANTEE CORPORATION
Operator History
originally filed by ENFIELD CORPORATION — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 3,164–3,224 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 537 ft | 400 sx |
| 2.375" | 3,111 ft | — |
| 4.5" | 5,980 ft | 500 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 7,500 ft
- Drill Type
- Vertical
- County
- MILAM
- District
- 1
- Operator
- SANTEE CORPORATION
- Completed
- 1981-08-20
Operator
- Name
- SANTEE CORPORATION
- Location
- MESQUITE
- P-5 Status
- Inactive (filed 1986-01-27)