42-331-34089

Final Completion Horizontal

LIGHTNING UNIT

MILAM County · District 3 · ETOCO L.P. · GIDDINGS (BUDA)

Permits

1

Max Depth

5,500 ft

First Permit

2011-12-23

Latest Activity

2011-12-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2012-04-20

Shut-In

Plugged

2015-10-15

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2012-02

Last Production

2016-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4)

CSV
FormationTop Depth (MD)
NAVARRO 2,293 ft
PECAN GAP 3,572 ft
AUSTIN CHALK 4,800 ft
BUDA 5,371 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
5,631–10,221 ftPerforated

Casing (2)

SizeSet DepthCement
9.875"2,060 ft590 sx
7"5,631 ft313 sx

Permit History (1)

Applications (1)

#730523 A ETOCO, L.P.
received 2011-12-21

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2012-06-13 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in MILAM County.

Well Details

Well Number
1H
Max Depth
5,500 ft
Drill Type
Horizontal
County
MILAM
District
3
Operator
ETOCO L.P.
Completed
2012-04-20

Operator

Location
HOUSTON
P-5 Status
X (filed 2026-04-17)
Cum Oil (all leases)
1,354,931 bbl
Cum Gas (all leases)
37,659,524 mcf
Activities
OPRS/G, OPRS/O
Total Permits
48