42-331-80440
Final CompletionDRGAC-LAMAR G.
MILAM County · District 1 · HULSE & THOMPSON · MINERVA-ROCKDALE
Permits
1
Max Depth
600 ft
First Permit
1980-09-25
Latest Activity
1980-09-25
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-10-28
Shut-In
—
Plugged
1990-06-05
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 298–312 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 2.375" | 300 ft | — |
| 4.5" | 340 ft | 36 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 4
- Max Depth
- 600 ft
- Drill Type
- Vertical
- County
- MILAM
- District
- 1
- Operator
- HULSE & THOMPSON
- Completed
- 1980-10-28
Operator
- Name
- HULSE & THOMPSON
- Location
- WICHITA FAL, LS
- P-5 Status
- Inactive (filed 1989-05-31)
- Total Permits
- 7