Permits
1
Max Depth
3,200 ft
First Permit
1979-12-03
Latest Activity
1979-12-03
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1979-12-28
Shut-In
—
Plugged
—
P-5 Org Status: Active
EWA / Permit operator mismatch
Scheduling: TNCH LLC ≠ Permit: BARNES-POMEROY OIL COMPANY
Resolved via: production → TNCH, LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
—
Max Pressure
—
Injection Interval
—
Injected (12mo)
21,640 bbl
Monthly injected volume (bbl, from H-10 filings through 2026-01-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 2,196 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CLEARFORK (Clear Fork) | 2,588 ft | -392 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 2,589–2,753 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 564 ft | 300 sx |
| 2.375" | 2,786 ft | — |
| 5.5" | 2,927 ft | 825 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet