42-347-31286

Final Completion

ACME BRICK

NACOGDOCHES County · District 6 · GOLDSMITH J. PAUL · TOOLAN (TRAVIS PEAK)

RRC Lookup

Permits

2

Max Depth

8,000 ft

First Permit

1984-04-03

Latest Activity

2014-10-27

Lifespan

31 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-06-01

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: GOLDSMITH J. PAUL ≠ Production: SOUTHWEST OPERATING, INC.-TYLER (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: GOLDSMITH J. PAUL ≠ Permit: ATLANTIS OIL COMPANY, INC.

Resolved via: productionSOUTHWEST OPERATING, INC.-TYLER

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#799034 A ATLANTIS OIL COMPANY, INC.
received 2014-10-24
#234433 A GOLDSMITH, J. PAUL
received 1984-12-18
#234433 A GOLDSMITH, J. PAUL
received 1984-07-02
#234433 A GOLDSMITH, J. PAUL
received 1984-03-27

Well Details

Well Number
1
Max Depth
8,000 ft
Drill Type
Vertical
District
6
Completed
1984-06-01

Operator

Location
TYLER
P-5 Status
Y (filed 1997-02-07)
Cum Oil (all leases)
91,853 bbl
Cum Gas (all leases)
143,046 mcf
Total Permits
61

External Links

Live © 2026 Petrora