42-349-02054
UMCCASLIN GAS UNIT
NAVARRO County · District 5 · TARRANT COUNTY WATER DISTRICT #1 · ROUNDHOUSE (TRAVIS PEAK)
Permits
2
Max Depth
11,186 ft
First Permit
1979-02-06
Latest Activity
1983-10-18
Lifespan
5 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-03-08
Shut-In
—
Plugged
1986-12-09
EWA / Permit operator mismatch
Scheduling: TARRANT COUNTY WATER DISTRICT #1 ≠ Permit: TEXACO INC.
Resolved via: scheduling → TARRANT COUNTY WATER DISTRICT #1
Operator History
originally filed by TEXACO INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (3)
| Interval | Type |
|---|---|
| 6,384–6,394 ft | Perforated |
| 6,866–6,874 ft | Perforated |
| 7,202–7,212 ft | Perforated |
Casing (9)
| Size | Set Depth | Cement |
|---|---|---|
| 20" | 47 ft | — |
| 13.625" | 433 ft | 330 sx |
| 13.375" | 433 ft | 330 sx |
| 9.625" | 1,001 ft | 325 sx |
| 9.625" | 4,516 ft | 300 sx |
| 9.625" | 4,516 ft | 300 sx |
| 5.5" | 6,020 ft | 862 sx |
| 5.5" | 7,100 ft | 300 sx |
| 5.5" | 9,020 ft | 862 sx |
Permit History (2)
Applications (2)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 11,186 ft
- Drill Type
- Vertical
- County
- NAVARRO
- District
- 5
- Operator
- TARRANT COUNTY WATER DISTRICT #1
- Completed
- 1979-03-08
Operator
- Location
- STREETMAN
- P-5 Status
- Inactive (filed 1986-05-22)
- Total Permits
- 1