42-349-33461

Final Completion

CARPENTER-ROWE UNIT

NAVARRO County · District 5 · PETRUS OPERATING CO. INC. · INGRAM TRINITY (RODESSA)

RRC Lookup

Permits

1

Max Depth

7,600 ft

First Permit

1983-09-15

Latest Activity

1983-09-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-11-07

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: PETRUS OPERATING CO. INC. ≠ Production: SOUTHWEST OPERATING, INC.-TYLER (reported 2025-12)

Resolved via: productionSOUTHWEST OPERATING, INC.-TYLER

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#216806 A PETRUS OPERATING CO., INC.
received 1983-08-24

Well Details

Well Number
1
Max Depth
7,600 ft
Drill Type
Vertical
County
NAVARRO
District
5
Completed
1983-11-07

Operator

Location
DALLAS
P-5 Status
New (filed 1987-07-15)
Total Permits
161

External Links

Live © 2026 Petrora