42-353-00511

Final Completion

BOYD C.E. ETAL PALO PINTO UNIT

NOLAN County · District 7 · CLEAR FORK INCORPORATED · EVB (PALO PINTO)

Permits

1

Max Depth

5,820 ft

First Permit

1994-06-14

Latest Activity

1994-06-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1996-11-06

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 2,503 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
PALO PINTO 5,653 ft-3,150 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
4,085–4,094 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"370 ft180 sx
5.5"6,686 ft600 sx

Permit History (1)

Applications (1)

#424716 A CLEAR FORK, INCORPORATED
received 1994-06-09

Records & Logs

3 completion filings on record · 1 with log images at RRC.

W-2/G-1 1994-06-20 log on file
W-2/G-1 1994-06-29
W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in NOLAN County.

Well Details

Well Number
2059
Max Depth
5,820 ft
Drill Type
Vertical
County
NOLAN
District
7

Operator

Location
ABILENE
P-5 Status
Active (filed 2026-02-04)
Cum Oil (all leases)
18,344,885 bbl
Cum Gas (all leases)
3,364,373 mcf
Activities
CSGD/P, G/PUR, OPRS/G, OPRS/O
Total Permits
471