Permits
1
Max Depth
5,800 ft
First Permit
1986-01-16
Latest Activity
1986-01-16
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1986-05-15
Shut-In
—
Plugged
—
P-5 Org Status: X
EWA / Permit operator mismatch
Scheduling: CEDAR OIL COMPANY ≠ Permit: ATAPCO
Resolved via: production → CEDAR OIL COMPANY
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
1,500 bbl/d
Max Pressure
1,500 psi
Injection Interval
3,100–3,600 ft
Injected (12mo)
1,325 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-11-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4)
CSV| Formation | Top Depth (MD) |
|---|---|
| FLIPPEN | 3,102 ft |
| STRAWN | 5,181 ft |
| ODEN | 5,420 ft |
| CADDO | 5,580 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,150–3,574 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 378 ft | 300 sx |
| 5.5" | 3,784 ft | 865 sx |
Permit History (1)
Applications (2)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 6
- Max Depth
- 5,800 ft
- Drill Type
- Vertical
- County
- NOLAN
- District
- 7
- Operator
- CEDAR OIL COMPANY
- Completed
- 1986-05-15
Operator
- Name
- CEDAR OIL CO
- Location
- ABILENE
- P-5 Status
- X (filed 2026-03-18)
- Cum Oil (all leases)
- 608,191 bbl
- Cum Gas (all leases)
- 343,580 mcf
- Activities
- OPRS/O
- Total Permits
- 76