42-353-32877

Final Completion

JONES-WESTERFIELD 4002

NOLAN County · District 7 · HEIGHTS ENERGY CORPORATION · HODNE S HILL (PENN)

Permits

1

Max Depth

6,000 ft

First Permit

2005-06-22

Latest Activity

2005-06-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2006-01-31

Shut-In

Plugged

2024-03-02

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2005-01

Last Production

2026-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (2)

IntervalType
5,188–5,194 ftPerforated
5,205–5,210 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"402 ft340 sx
5.5"5,375 ft125 sx

Permit History (1)

Applications (1)

#602353 A HEIGHTS ENERGY CORPORATION
received 2005-06-21

Records & Logs

4 completion filings on record · 1 with log images at RRC.

W-2/G-1 2006-02-06
W-2/G-1 2005-12-21 log on file
W-2/G-1 2006-02-13
W-2/G-1 2006-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in NOLAN County.

Well Details

Well Number
4002
Max Depth
6,000 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
2006-01-31

Operator

Location
PLANO
P-5 Status
X (filed 2026-03-13)
Cum Oil (all leases)
401,652 bbl
Cum Gas (all leases)
15,011 mcf
Activities
OPRS/O
Total Permits
54