Permits
2
Max Depth
7,700 ft
First Permit
2008-09-12
Latest Activity
2010-06-28
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2010-07-16
Shut-In
—
Plugged
—
EWA / Permit operator mismatch
Scheduling: D.K.D. ≠ Permit: DUNAGIN TRANSPORT COMPANY
Resolved via: scheduling → D.K.D.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2008-12
Last Production
2026-07
Injection / Disposal
Permitted Volume
6,000 bbl/d
Max Pressure
1,575 psi
Injection Interval
3,150–4,595 ft
Injected (12mo)
193,750 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-11-01)
Operator History
originally filed by DUNAGIN TRANSPORT COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 2,076 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| COLEMAN JUNCTION | 2,702 ft | -626 ft |
| DOTHAM LIME | 3,178 ft | -1,102 ft |
| NOODLE CREEK | 3,766 ft | -1,690 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 3,180–3,188 ft | Perforated |
| 3,222–3,226 ft | Perforated |
| 3,960–4,560 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 215 ft | 140 sx |
| 4.5" | 3,959 ft | 640 sx |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet