42-353-33114

SHUT IN

STEWART B

NOLAN County · District 7 · PATTON E. N. OIL COMPANY INC. · HOLLEY (ELLENBURGER)

Permits

1

Max Depth

6,500 ft

First Permit

2009-11-13

Latest Activity

2009-11-13

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2009-12-28

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2009-12

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3) Elevation 1,988 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION 2,390 ft-402 ft
STRAWN SAND (Strawn)5,397 ft-3,409 ft
ELLENBURGER 5,978 ft-3,990 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
5,998–6,008 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"147 ft90 sx
5.5"6,099 ft275 sx

Permit History (1)

Applications (1)

#687256 A PATTON, E. N. OIL COMPANY, INC.
received 2009-11-11

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2010-03-03 log on file
W-2/G-1 2010-04-29

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in NOLAN County.

Well Details

Well Number
1
Max Depth
6,500 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
2009-12-28

Operator

Location
ABILENE
P-5 Status
X (filed 2025-10-09)
Cum Oil (all leases)
1,664,723 bbl
Cum Gas (all leases)
2,310,148 mcf
Activities
OPRS/G, OPRS/O
Total Permits
153