Permits
1
Max Depth
7,000 ft
First Permit
1985-05-23
Latest Activity
1985-05-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1985-06-17
Injection / Disposal
Permitted Volume
—
Max Pressure
—
Injection Interval
—
Injected (12mo)
—
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 845–6,608 ft | Perforated |
| ?–6,602 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 847 ft | — |
| 5.5" | 6,670 ft | — |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 7,000 ft
- Drill Type
- Vertical
- County
- NUECES
- District
- 4
- Operator
- TEPCO ENGINEERING
Operator
- Name
- TEPCO ENGINEERING
- Location
- ALICE
- P-5 Status
- Delinquent (filed 1989-10-19)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/G
- Total Permits
- 79