Permits
1
Max Depth
4,711 ft
First Permit
1977-08-12
Latest Activity
1977-08-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1964-08-01
Shut-In
—
Plugged
1996-12-17
EWA / Production operator mismatch
Scheduling: TEXACO INC. ≠ Production: DECKER OPERATING CO., L.L.C. (reported 2006-10)
Resolved via: scheduling → TEXACO INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2008-03
Injection / Disposal
Permitted Volume
2,000 bbl/d
Max Pressure
1,350 psi
Injection Interval
3,714–3,954 ft
Injected (12mo)
—
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 3,843–3,954 ft | Perforated |
| 4,189–4,196 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 262 ft | 125 sx |
| 2.375" | 3,618 ft | — |
| 4.5" | 4,710 ft | 660 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 29
- Max Depth
- 4,711 ft
- Drill Type
- Vertical
- County
- NUECES
- District
- 4
- Operator
- TEXACO INC.
- Completed
- 1964-08-01
Operator
- Name
- TEXACO INC
- Location
- MIDLAND
- P-5 Status
- Inactive (filed 1996-11-27)
- Total Permits
- 4,906