Permits
3
Max Depth
7,386 ft
First Permit
1983-06-20
Latest Activity
1986-09-17
Lifespan
3 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-12-16
Shut-In
—
Plugged
2003-01-23
EWA / Permit operator mismatch
Scheduling: NEG OPERATING LLC ≠ Permit: TEXACO PRODUCING INC.
Resolved via: scheduling → NEG OPERATING LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-01
Operator History
originally filed by TEXACO PRODUCING INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (8) Elevation 40 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| LAGARTO | 2,750 ft | -2,710 ft |
| OAKVILLE | 3,600 ft | -3,560 ft |
| CATAHOULA | 4,200 ft | -4,160 ft |
| OATAHOULA | 4,200 ft | -4,160 ft |
| CATAHOULA -MASS- (Catahoula) | 4,750 ft | -4,710 ft |
| CATAHOULA-MASS- (Catahoula) | 4,750 ft | -4,710 ft |
| ANAHUAC | 5,000 ft | -4,960 ft |
| FRIO | 5,800 ft | -5,760 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (8)
| Interval | Type |
|---|---|
| 3,347–3,355 ft | Perforated |
| 3,412–3,418 ft | Perforated |
| 3,494–3,498 ft | Perforated |
| 3,501–3,507 ft | Perforated |
| 3,510–3,513 ft | Perforated |
| 4,305–4,320 ft | Perforated |
| ?–3,645 ft | Perforated |
| ?–4,519 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 1,550 ft | 800 sx |
| 4.5" | 5,600 ft | 1,350 sx |
| 4.5" | 5,600 ft | — |
| 4.5" | 5,617 ft | 1,350 sx |
| 4.5" | 5,617 ft | — |
Permit History (3)
Applications (3)
Records & Logs
9 completion filings on record · 1 with log images at RRC.
+3 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 71H
- Max Depth
- 7,386 ft
- Drill Type
- Vertical
- County
- NUECES
- District
- 4
- Operator
- NEG OPERATING LLC
- Completed
- 1983-12-16
Operator
- Name
- NEG OPER LLC
- Location
- OKLAHOMA CI, TY
- P-5 Status
- Inactive (filed 2007-12-10)
- Cum Oil (all leases)
- 2,232,583 bbl
- Cum Gas (all leases)
- 47,295,788 mcf
- Total Permits
- 238