Permits
2
Max Depth
8,700 ft
First Permit
1987-09-03
Latest Activity
1987-09-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-11-06
Shut-In
—
Plugged
1988-06-26
EWA / Permit operator mismatch
Scheduling: TEXACO INC. ≠ Permit: UNION PACIFIC RESOURCES COMPANY
Resolved via: scheduling → TEXACO INC.
Operator History
originally filed by UNION PACIFIC RESOURCES COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 105 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| 1500' SAND | 1,500 ft | -1,395 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 1,543–1,549 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 1,275 ft | 770 sx |
| 5.5" | 2,216 ft | 495 sx |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 8,700 ft
- Drill Type
- Vertical
- County
- NUECES
- District
- 4
- Operator
- TEXACO INC.
- Completed
- 1987-11-06
Operator
- Name
- TEXACO INC
- Location
- MIDLAND
- P-5 Status
- Inactive (filed 1996-11-27)
- Total Permits
- 4,906