Permits
2
Max Depth
8,000 ft
First Permit
1998-04-20
Latest Activity
1998-05-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1998-12
Last Production
2012-01
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (6) Elevation 13 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| MIOCENE (Miocene (undifferentiated)) | 1,944 ft | -1,931 ft |
| FRIO | 3,312 ft | -3,299 ft |
| SINTON | 4,891 ft | -4,878 ft |
| LOPEZ | 4,987 ft | -4,974 ft |
| COUNTISS | 5,012 ft | -4,999 ft |
| FRIO 6900 (Frio) | 7,262 ft | -7,249 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (5)
| Interval | Type |
|---|---|
| 6,220–6,222 ft | Perforated |
| 6,265–6,272 ft | Perforated |
| 6,276–6,278 ft | Perforated |
| 6,594–6,594 ft | Perforated |
| 6,594–6,598 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.375" | 1,165 ft | 545 sx |
| 8.375" | 1,165 ft | 555 sx |
| 5.5" | 7,432 ft | 444 sx |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet