42-357-31481

Final Completion

MCGARRAUGH

OCHILTREE County · District 10 · LAMBERSON OPERATING · HORIZON (CLEVELAND)

Permits

1

Max Depth

8,800 ft

First Permit

1983-11-29

Latest Activity

1983-11-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-02-21

Shut-In

—

Plugged

1989-02-15

!

EWA / Permit operator mismatch

Scheduling: LAMBERSON OPERATING ≠ Permit: EL PASO EXPLORATION CO.

Resolved via: scheduling → LAMBERSON OPERATING

Operator History

originally filed by EL PASO EXPLORATION CO. — asset transferred

Formation Tops (9) Elevation 3,051 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
B/HUBNER5,688 ft-2,637 ft
KANSAS CITY 6,784 ft-3,733 ft
CLEVELAND 6,980 ft-3,929 ft
OSWEGO 7,467 ft-4,416 ft
GRANITE WASH 7,585 ft-4,534 ft
ATOKA 8,184 ft-5,133 ft
NOVI8,255 ft-5,204 ft
13 FINGERS8,332 ft-5,281 ft
MORROW SHALE (Morrow)8,446 ft-5,395 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
7,064–7,076 ftPerforated
7,081–7,087 ftPerforated

Casing (3)

SizeSet DepthCement
20"58 ft—
8.625"1,522 ft1,150 sx
5.5"8,758 ft550 sx

Permit History (1)

Applications (1)

#221961 A EL PASO EXPLORATION CO.
received 1983-11-21

Records & Logs

2 completion filings on record.

W-2/G-1 1984-05-29
W-2/G-1 1984-05-29

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in OCHILTREE County.

Well Details

Well Number
1
Max Depth
8,800 ft
Drill Type
Vertical
County
OCHILTREE
District
10
Completed
1984-02-21

Operator

Location
PAMPA
P-5 Status
Inactive (filed 1992-07-03)
Total Permits
1