42-361-30914

Final Completion Directional

PORT OF ORANGE-RIVERSIDE

ORANGE County · District 3 · XTO ENERGY INC. · PHOENIX LAKE (HACKBERRY 10 530)

RRC Lookup

Permits

3

Max Depth

10,800 ft

First Permit

2011-04-19

Latest Activity

2014-07-08

Lifespan

3 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2011-08-30

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: XTO ENERGY INC. ≠ Production: OLIPDP II, LLC (reported 2025-12)

Resolved via: productionOLIPDP II, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2011-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#788997 A XTO ENERGY INC.
received 2014-09-17
#788997 A XTO ENERGY INC.
received 2014-06-09
#714283 A LAKE RONEL OIL COMPANY
received 2011-04-14

Well Details

Well Number
1
Max Depth
10,800 ft
Drill Type
Directional
County
ORANGE
District
3
Completed
2011-08-30

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora