42-363-31080

Final Completion

HART J

PALO PINTO County · District 7 · DALLAS PRODUCTION INC. · PALO PINTO CO. REG. (GAS)

Permits

1

Max Depth

4,800 ft

First Permit

1979-05-18

Latest Activity

1979-05-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-04-03

Shut-In

Plugged

2005-10-21

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2005-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,256–4,408 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"258 ft180 sx
2.375"4,380 ft
4.5"4,500 ft600 sx

Permit History (1)

Applications (1)

#48759 A DALLAS PRODUCTION, INC.
received 1979-05-18

Records & Logs

1 completion filing on record.

W-2/G-1 1979-05-15

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
1
Max Depth
4,800 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1979-04-03

Operator

Location
DALLAS
P-5 Status
Inactive (filed 2020-02-11)
Cum Oil (all leases)
3,138,597 bbl
Cum Gas (all leases)
150,942,979 mcf
Total Permits
823