42-363-31775

Final Completion

POPP A. D.

PALO PINTO County · District 7 · POLK & PATTON INC. · STRAWN N. (BEND CONGL.)

Permits

2

Max Depth

4,000 ft

First Permit

1977-07-19

Latest Activity

1986-04-08

Lifespan

9 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1977-09-02

Shut-In

Plugged

1994-04-14

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 1,166 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
PREGNANT SHALE3,520 ft-2,354 ft
BIG SALINE 3,600 ft-2,434 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
2,251–2,255 ftPerforated
2,273–2,277 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"250 ft180 sx
4.5"3,949 ft225 sx

Permit History (2)

Applications (2)

#300773 A POLK & PATTON, INC.
received 1986-04-07
#3400 A POLK & PATTON, INC.
received 1977-07-19

Records & Logs

3 completion filings on record · 1 with log images at RRC.

W-2/G-1 1986-05-02 log on file
W-2/G-1 1986-05-17
W-2/G-1 1977-12-07

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
2
Max Depth
4,000 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1977-09-02

Operator

Location
ABILENE
P-5 Status
Inactive (filed 1991-07-25)
Total Permits
280