42-363-32377

Final Completion

COOK, J. T.

PALO PINTO County · District 7 · TAD ENERGY COMPANY

Permits

3

Max Depth

5,100 ft

First Permit

1980-05-20

Latest Activity

1988-07-22

Lifespan

8 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 988 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
PREGNANT SHALE3,982 ft-2,994 ft
BEND CONG. (Bend)4,324 ft-3,336 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
3,191–3,211 ftPerforated
4,724–4,728 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"366 ft266 sx
2.375"4,700 ft
4.5"4,800 ft360 sx

Permit History (3)

Applications (4)

#133260 X TAD ENERGY COMPANY
received 1988-07-21
#349559 A TAD ENERGY COMPANY
received 1988-07-21
#133260 A TAD ENERGY COMPANY
received 1981-09-15
#82009 A TAD ENERGY COMPANY
received 1980-05-20

Records & Logs

3 completion filings on record · 1 with log images at RRC.

W-2/G-1 1988-07-19 log on file
W-2/G-1 1988-08-02
W-2/G-1 1980-06-23

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
1
Max Depth
5,100 ft
Drill Type
Vertical
County
PALO PINTO
District
7

Operator

Location
CISCO
P-5 Status
Inactive (filed 1990-10-08)
Total Permits
23