42-363-32621

Final Completion

SMITH WILBURN E.

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · MINERAL WELLS NORTH (BIG SALINE)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1981-04-08

Latest Activity

1981-04-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-06-09

Shut-In

Plugged

1998-05-12

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: MITCHELL ENERGY CORPORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-05

Operator History

originally filed by MITCHELL ENERGY CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#114306 A MITCHELL ENERGY CORPORATION
received 1981-04-08

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1981-06-09

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora