42-363-33122

Final Completion

WHARTON

PALO PINTO County · District 7 · MAYO EDDIE · CLARENCE (CONGL.)

Permits

1

Max Depth

5,000 ft

First Permit

1983-06-17

Latest Activity

1983-06-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-11-11

Shut-In

Plugged

1988-06-09

!

EWA / Permit operator mismatch

Scheduling: MAYO EDDIE ≠ Permit: WESTERN ENERGY RESOURCES, INC.

Resolved via: schedulingMAYO EDDIE

Operator History

originally filed by WESTERN ENERGY RESOURCES, INC. — asset transferred

Formation Tops (1) Elevation 861 ft

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CONGLOMERATE3,837 ft-2,976 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
3,837–3,841 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"355 ft260 sx
4.5"4,470 ft224 sx

Permit History (1)

Applications (1)

#198567 A WESTERN ENERGY RESOURCES, INC.
received 1983-06-17

Records & Logs

2 completion filings on record.

W-2/G-1 1984-01-31
W-2/G-1 1984-01-31

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
1A
Max Depth
5,000 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Operator
MAYO EDDIE
Completed
1983-11-11

Operator

Location
FREDERICKSB, RG
P-5 Status
Delinquent (filed 2010-09-23)
Cum Oil (all leases)
159,864 bbl
Cum Gas (all leases)
782,526 mcf
Activities
OPRS/G
Total Permits
44