42-363-34060

Final Completion

IRELAND DALE UNIT

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · CLYDE HARPER (MARBLE FALLS)

Permits

1

Max Depth

4,200 ft

First Permit

1990-11-07

Latest Activity

1990-11-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-12-10

Shut-In

Plugged

1995-04-28

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: K & M EXPLORATION, 1973-3 LTD. (reported 1994-05)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: K & M EXPLORATION, 1973-3 LTD.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-04

Operator History

originally filed by K & M EXPLORATION, 1973-3 LTD. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (6) Elevation 1,134 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
BIG SALINE 3,590 ft-2,456 ft
BIG SALINE CONG. (Big Saline)3,590 ft-2,456 ft
HARKEN CONG.3,820 ft-2,686 ft
HARKEN CONGLOMERATE3,820 ft-2,686 ft
MARBLE FALLS 4,128 ft-2,994 ft
MARBLE FALLS LIME (Marble Falls)4,128 ft-2,994 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
3,832–3,840 ftPerforated
4,162–4,170 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"292 ft190 sx
4.5"4,207 ft220 sx

Permit History (1)

Applications (1)

#380304 A K & M EXPLORATION, 1973-3 LTD.
received 1990-10-29

Records & Logs

3 completion filings on record · 1 with log images at RRC.

W-2/G-1 1991-01-09 log on file
W-2/G-1 1991-03-11
W-2/G-1 1991-02-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
1
Max Depth
4,200 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1990-12-10

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf