42-363-34343

Final Completion

HOLT A

PALO PINTO County · District 7 · HARWELL ENTERPRISES INC. · CAMILLE (CONGL)

Permits

1

Max Depth

4,500 ft

First Permit

1994-12-15

Latest Activity

1994-12-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-02-28

Shut-In

Plugged

1997-09-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-02

Last Production

1997-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 898 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
STRAWN 2,325 ft-1,427 ft
BIG SALINE 3,465 ft-2,567 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
3,670–3,677 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"286 ft175 sx
4.5"4,115 ft175 sx

Permit History (1)

Applications (1)

#430920 A HARWELL ENTERPRISES INC.
received 1994-12-12

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1995-03-30 log on file
W-2/G-1 1995-04-10

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
2
Max Depth
4,500 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1995-02-28

Operator

Location
WEATHERFORD
P-5 Status
Inactive (filed 1999-05-05)
Cum Oil (all leases)
186 bbl
Cum Gas (all leases)
251,761 mcf
Total Permits
7