42-363-34575

Final Completion

LANE

PALO PINTO County · District 7 · CROWN EQUIPMENT CO. · PALO PINTO COUNTY REGULAR

RRC Lookup

Permits

2

Max Depth

4,999 ft

First Permit

1996-09-03

Latest Activity

1996-09-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: CROWN EQUIPMENT CO. ≠ Production: BACON ENERGY (reported 2020-07)

!

EWA / Permit operator mismatch

Scheduling: CROWN EQUIPMENT CO. ≠ Permit: CERTIFIED PETROLEUM INC.

Resolved via: schedulingCROWN EQUIPMENT CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-11

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#452038 A CERTIFIED PETROLEUM INC.
received 1996-12-09
#452038 A CERTIFIED PETROLEUM INC.
received 1996-08-29

Well Details

Well Number
103
Max Depth
4,999 ft
Drill Type
Vertical
County
PALO PINTO
District
7

Operator

Location
WEATHERFORD
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
282,426 bbl
Cum Gas (all leases)
23,645,105 mcf
Activities
OPRS/G
Total Permits
110

External Links

Live © 2026 Petrora