42-363-35746

Final Completion

NICHOLS

PALO PINTO County · District 7 · MCCOWN ENGINEERING · PALO PINTO CO. REG. (GAS)

Permits

1

Max Depth

4,000 ft

First Permit

2008-02-21

Latest Activity

2008-02-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-08-31

Shut-In

Plugged

2016-10-13

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-02

Last Production

2016-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,248–3,256 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"170 ft120 sx
4.5"3,447 ft200 sx

Permit History (1)

Applications (1)

#655297 A MCCOWN ENGINEERING
received 2008-02-14

Records & Logs

4 completion filings on record · 2 with log images at RRC.

W-2/G-1 2009-09-03 log on file
W-2/G-1 2009-12-10
W-2/G-1 2009-05-01 log on file
W-2/G-1 2009-06-15

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
1
Max Depth
4,000 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
2008-08-31

Operator

Location
WICHITA FAL, LS
P-5 Status
Inactive (filed 2022-12-29)
Cum Oil (all leases)
51,722 bbl
Cum Gas (all leases)
13,512 mcf
Total Permits
5