42-365-01407

Final Completion

THOMPSON

PANOLA County · District 6 · DEVON ENERGY PRODUCTION CO L.P. · CARTHAGE (THOMPSON)

RRC Lookup

Permits

1

Max Depth

6,512 ft

First Permit

1999-05-18

Latest Activity

1999-05-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1962-10-27

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Production: PENNZOIL EXPLORATION & PROD. CO. (reported 1995-09)

!

EWA / Permit operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Permit: PENNZENERGY EXP. & PROD., L.L.C.

Resolved via: schedulingDEVON ENERGY PRODUCTION CO L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by PENNZENERGY EXP. & PROD., L.L.C. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#483939 A PENNZENERGY EXP. & PROD., L.L.C.
received 1999-04-19

Well Details

Well Number
2
Max Depth
6,512 ft
Drill Type
Vertical
County
PANOLA
District
6
Completed
1962-10-27

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
360,504,673 bbl
Cum Gas (all leases)
9,266,199,431 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,223

External Links

Live © 2026 Petrora