42-365-32106

Final Completion

WIENER W.B. JR.

PANOLA County · District 6 · TEXACO E & P INC. · BETHANY (TRAVIS PEAK 7450)

RRC Lookup

Permits

3

Max Depth

8,700 ft

First Permit

1989-05-23

Latest Activity

1993-11-22

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-01-26

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: TEXACO E & P INC. ≠ Production: CHEVRON U. S. A. INC. (reported 2020-10)

Resolved via: schedulingTEXACO E & P INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#418394 A TEXACO E & P INC.
received 1993-11-18
#359481 A TEXACO INC.
received 1990-03-01
#359481 A TEXACO INC.
received 1989-05-19

Well Details

Well Number
1
Max Depth
8,700 ft
Drill Type
Vertical
County
PANOLA
District
6
Completed
1990-01-26

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
176,155,764 bbl
Cum Gas (all leases)
1,401,949,654 mcf
Activities
OPRS/O
Total Permits
3,332

External Links

Live © 2026 Petrora