42-365-32277
Final CompletionBRIGGS-MORELAND GU
PANOLA County · District 6 · XTO ENERGY INC. · BRIGGS (7800 TRAVIS PEAK)
Permits
4
Max Depth
9,700 ft
First Permit
1990-01-29
Latest Activity
1996-08-28
Lifespan
7 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2017-06-13
Shut-In
—
Plugged
2019-05-14
EWA / Permit operator mismatch
Scheduling: XTO ENERGY INC. ≠ Permit: SONAT EXPLORATION COMPANY -TYLER
Resolved via: scheduling → XTO ENERGY INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2019-05
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (15) Elevation 226 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| GOODLAND | 2,730 ft | -2,504 ft |
| GLEN ROSE | 3,280 ft | -3,054 ft |
| BASE MASSIVE ANHYDRITE (Massive Anhydrite (marker)) | 4,984 ft | -4,758 ft |
| BMA | 4,984 ft | -4,758 ft |
| PETTIT | 5,770 ft | -5,544 ft |
| PETTIT | 6,070 ft | -5,844 ft |
| TRAVIS PEAK | 6,070 ft | -5,844 ft |
| PETTIT | 6,770 ft | -6,544 ft |
| TRAVIS PEAK | 6,770 ft | -6,544 ft |
| COTTON B LIME | 8,154 ft | -7,928 ft |
| COTTON VALLEY "B" LIME (Cotton Valley) | 8,154 ft | -7,928 ft |
| COTTON VALLEY "B" LM (Cotton Valley) | 8,154 ft | -7,928 ft |
| COTTON VALLEY 'B' LM (Cotton Valley) | 8,154 ft | -7,928 ft |
| COTTON VALLEY (UPPER DAVIS) (Cotton Valley) | 9,104 ft | -8,878 ft |
| COTTON VALLEY UPPER DAVIS (Cotton Valley) | 9,104 ft | -8,878 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (8)
| Interval | Type |
|---|---|
| 6,330–7,546 ft | Perforated |
| 6,336–6,342 ft | Perforated |
| 6,468–6,486 ft | Perforated |
| 7,796–7,874 ft | Perforated |
| 9,132–9,146 ft | Perforated |
| 9,132–9,535 ft | Perforated |
| 9,493–9,499 ft | Perforated |
| 9,527–9,535 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 16" | 80 ft | — |
| 9.625" | 1,215 ft | 460 sx |
| 5.5" | 9,697 ft | 2,440 sx |
Permit History (4)
Applications (4)
Records & Logs
15 completion filings on record · 3 with log images at RRC.
+9 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 10C
- Max Depth
- 9,700 ft
- Drill Type
- Vertical
- County
- PANOLA
- District
- 6
- Operator
- XTO ENERGY INC.
- Completed
- 2017-06-13
Operator
- Name
- XTO ENGY INC
- Location
- SPRING
- P-5 Status
- X (filed 2026-04-08)
- Cum Oil (all leases)
- 772,419,164 bbl
- Cum Gas (all leases)
- 11,039,899,986 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 16,138