42-365-34034

ADAMS T. C.

PANOLA County · District 6 · DEVON ENERGY PRODUCTION CO L.P. · BETHANY (TRAVIS PEAK CONS.)

RRC Lookup

Permits

2

Max Depth

8,000 ft

First Permit

1998-08-31

Latest Activity

1998-08-31

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1999-10-13

Shut-In

Plugged

!

EWA / Permit operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Permit: PENNZOIL EXPLORATION & PROD. CO.

Resolved via: schedulingDEVON ENERGY PRODUCTION CO L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1999-04

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#479099 A PENNZENERGY EXP. & PROD., L.L.C.
received 1999-08-30
#479099 A PENNZOIL EXPLORATION & PROD. CO.
received 1998-08-28

Well Details

Well Number
A 2
Max Depth
8,000 ft
Drill Type
Vertical
County
PANOLA
District
6
Completed
1999-10-13

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
360,504,673 bbl
Cum Gas (all leases)
9,266,199,431 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,223

External Links

Live © 2026 Petrora